The Pedemontana Lombarda Highway System consists of 67 km of toll highways connecting A8 Milano-Varese and A9 Milano-Como highways with A4 Milano-Venice highway, 20km of beltways in Como and Varese and 70km of local roads, including a massive amount of viaducts, bridges, tunnels, culverts and minor works.
Client: Various (Idroesse Infrastrutture S.p.a., Girpa S.p.a., Ficube S.r.l., Zollet Ingegneria S.r.l., URS Italia S.p.a.) – Italy / Completion period: 2008-2012 / Construction cost: 4,100 Mln EUR / Services provided: Design Development for several viaducts and underpasses, Road Safety and Accident Analysis, Drainage network Detailed Design, Main Road Works Detailed Design.
-
-
The existing Brescia Southern Beltway has been widened to include one additional lane per carriageway, along with substantial redefinition of all four major intersections and exits and with the complete replacement of all in line and overpassing viaducts and underpasses.
Client: Gripa S.p.a. – Italy / Completion period: 2005-2006 / Construction cost: 11.0 Mln EUR / Services provided: Detailed Highway Design.
-
-
Mestre Highway by-pass is a 32.5 km 3+3 lanes highway bypass on A4 highway built around the city of Mestre (VE) in the north of Italy. The Project includes 5 main exits with toll barriers and 3 main interchanges, with over 100 km of external roads, along with massive environmental impact mitigation works and new utilities.
Client: Various (Idroesse Ingegneria S.r.l., Girpa S.p.a., Gruppo Grigolin S.p.a., STS S.r.l., Mestrinaro S.p.a.) – Italy / Completion period: 2004 – 2009 / Construction cost: 970 Mln EUR / Services provided: Detailed Design, Quantity Surveying, Shop Drawings for multiple structural works (underpasses, viaducts and box culverts).
-
-
In 2007 Gonu Hurricane caused extensive flooding and substantial damages to bridges, culverts and roads along Quriyat National Road in the Quriyat Region of the Sultanate of Oman. The rehabilitation works included massive wadi reshaping and confining works and the complete reconstruction of several viaducts and box culverts wiped away by the floods.
Client: Idroesse Infrastrutture S.p.a. – Italy / Completion period: 2007 – 2009 / Construction cost: 26.1 Mln EUR / Services provided: Preliminary and Detailed Design for Viaducts and Box Culverts.
-
-
Al Hamydia Interchange is a complex interchange consisting in over 70’000 square meters of new paved roads, 7 viaducts, 1 underpass and related works located at the border between Sharjah and Ajman Emirates along E 11 Road in UAE, one of the country’s vital arteries.
Client: Idroesse Infrastrutture S.p.a. – Italy / Completion period: 2010 / Construction cost: 210 Mln AED / Services provided: Preliminary and Detailed Design for Pedestrian Underpasses.
-
-
South Shamkha is a mixed use development, extending over an area is approximately 40 sqkm, designed for up to 165,000 residents and an estimated 130,000 non-residents working in offices, retail, and commercial activities along with public and social facilities.
Client: Idroesse Infrastrutture S.p.a. – Italy / Completion period: 2009 / Construction cost: n/a / Services provided: Technical Support Services for Infrastructures Design.
Questo testo descrive roads and highways