Page 23 - LC&P - Brief Company Profile
P. 23
Selected Projects Airports TWY G Refurbishment at Salalah International Airport – Salalah, Sultanate of Oman Salalah International Airport is planned to reach a capacity of 6 Mln pax/year in 4 Phases. The project also includes a new code F 4,000 x 60 m runway, a new Air Traffic Control Tower, a new access road system and a 2,000 vehicle car park. During Phase 2 the former runway 07-25 is meant to be refurbished and converted into an ICAO Code F taxiway named TWY G. Client: JV Galfar Engineering & Contracting - Larsen and Toubro - Sultanate of Oman Completion period: 2016 Construction cost: n/a Services provided: Pavement and Geotechnical Investigation, Pavement Calculations and Design Al Maktoum International Airport – Dubai, United Arab Emirates Al Maktoum International Airport is planned to be world’s largest airport, reaching a capacity of 200 Mln pax/year in 2 phases. In its Phase 1 an initial portion will be put into service on the Western side of the site, including runways and taxiway system, ATC equipment, control tower, technical facilities, roads and landside infrastructure. Phase 2 will be developed Eastward. Client: Dubai Aviation Engineering Projects - UAE Completion period: 2016 - 2017 Construction cost: n/a Services provided: Peer Review of Masterplan (airside, landside, traffic forecasts and specialized simulations) Excellence, engineered.